Adjust charger configuration, utilisation, pricing, and electricity costs to estimate payback, profit, and long-term project returns for your site.
Estimates are indicative. For numbers specific to your location, traffic, and grid capacity, request a site assessment.
Charging station costs vary with station size and site conditions. The calculator above gives an overview based on your own figures. Five key factors shape the estimate.
Higher-power DC chargers can charge compatible vehicles faster, but require more investment and grid capacity. The number of cars served also depends on actual demand.
A site with sufficient electrical capacity costs less to develop than one requiring a line extension or a new transformer. This work must be coordinated with the utility (PEA or MEA).
Cable runs, foundations, canopies and parking-bay layouts vary by site.
The gap between the charging price and the cost of electricity is the station's main income. The Low Priority tariff is an option for eligible stations that meet the utility's requirements.
Location and traffic determine the payback period, so the site should be assessed before investing.
Read more: Investing in an EV charging station: what site owners should know · The Low Priority tariff explained · AC vs DC charging · FAQ

A site assessment replaces assumptions with your site's real traffic, tariff eligibility, and connection costs.